Submitting planning permission applications online
This online portal allows for the electronic submission of planning permission applications. It improves the service provided to users by offering better information on the processing of their application, optimizing processing times, and generating savings for applicants due to the elimination of photocopying and postage costs.
Applications for planning permission (Prior Declaration and Building Permit) must be submitted electronically via this link only: https://rgd.pu.sirap.com/
Any electronic submission of planning permission applications via a means/device other than the aforementioned will not be considered admissible.
However, submitting paper applications for planning permission remains possible. For the paper application to be admissible, it must be reproduced in 3 complete copies, to be submitted to the urban planning department or in the town hall's post office box.
Building permit / development permit
- Creation of a floor area or footprint exceeding 20 m²
- Change of use involving works modifying the load-bearing structures or the facade of the building
- An extension creating a floor area or footprint between 20 m² and 40 m² that does not result in the total floor area or footprint of the building exceeding 150 m²
- Building permit for a detached house: Application for a building permit for a detached house and/or its outbuildings (PCMI) (Form 13406*15) | Service-Public.fr
- Building permit including or not including demolitions (other than those relating to a detached house or its outbuildings): Application for a building permit (other than for a detached house or its outbuildings) (Form 13409*15) | Service-Public.fr
- Development permit (subdivision, land divisions when this involves the creation of roads, spaces and common facilities): Application for a planning permit (Form 16297*03) | Service-Public.fr
Prior declaration
- A construction with a floor area or footprint between 5 m² and 20 m²: extension, garage, enclosed or open garden shed, veranda, pergola, awning, terrace (see regulations file above)
- An extension that creates a floor area between 20 m² and 40 m²: provided it does not bring the total floor area of the building above 150 m²
- Swimming pool construction: see regulations file above
- Work on existing buildings modifying the exterior appearance: replacement of windows and doors, creation of openings in the facade, replacement or creation of roof windows, facade renovation, exterior insulation, roof repair, replacement of railings
- The installation of photovoltaic panels, solar collectors (on the ground or on the roof)
- Installing an air conditioner
- The installation of a fence, a gate
- The renovation of a shop front
- Change of use without works or with works that do not modify the load-bearing structures of the building or its facade
- Prior Declaration of Construction: Prior declaration of construction and works not subject to a building permit (Form 16702*01) | Service-Public.fr
- Prior Declaration of Development: Prior declaration of installations and developments not subject to a planning permit (Form 16703*01) | Service-Public.fr
Town planning certificate
This document outlines the planning regulations applicable to a given plot of land. There are two types. The informative planning certificate (CU) provides information on the current status of a plot of land. The operational planning certificate (CU) provides information on the feasibility of the project.
- Informative urban planning certificate: Application for a planning certificate (Form 13410*12) | Service-Public.fr
- Operational urban planning certificate: Application for a planning certificate (Form 13410*12) | Service-Public.fr
Modification of a work authorization for prior declarations, building permits and development permits: Request to modify a valid or regularized permit (Form 16700*01) | Service-Public.fr
Application for transfer of a work authorization for prior declarations, building permits and development permits: Requesting the transfer of a valid planning permission (Form 16701*01) | Service-Public.fr
Start of work / Work completed
– Declaration of Commencement of Works: This document notifies the town hall of the start of construction work. It concerns the holder of a building permit, a development permit, or a prior declaration. It must be submitted as soon as work begins.
– Declaration of Completion and Conformity of Works: the holder of a planning permission or the person who supervised the works must send a DAACT (Declaration of Completion and Conformity of Works) to the town hall to report the completion of the works. This declaration is mandatory for works that were subject to a building permit, a development permit, or a prior declaration.
- Declaration of commencement of works: Declaration of commencement of works (Form 13407*10) | Service-Public.fr
- Declaration of completion and conformity of works: Declaration attesting to the completion and conformity of the work (Form 13408*12) | Service-Public.fr
Consulting architect
The CAUE's Consulting Architect is available on the third Thursday of each month from 1:30 pm to 4:30 pm to review your planning projects (free consultation). Please feel free to make an appointment with the planning department: Tel. 04 79 41 98 84
Public Access Building (ERP)
Publicly accessible establishments are subject to specific regulations regarding safety and fire, and accessibility for people with reduced mobility.
What is a Public Access Establishment?
A public access building (ERP) is a building, premises, or enclosure, public or private, to which external persons (customers) other than employees are admitted, either freely, free of charge, or upon payment of some kind of fee, whether restricted or by invitation. These establishments must be designed to limit the risk of fire, alert occupants to an incident, facilitate their evacuation, allow emergency services to be alerted, and facilitate intervention. They are classified by type and category, which define the regulatory requirements.
Bonds
Publicly accessible establishments (ERP) are required to be equipped with an automated external defibrillator (AED) in accordance with Articles L. 123-5 and L. 123-6 of the French Building and Housing Code (and Article L. 5233-1 of the French Public Health Code) according to the following schedule: this text enters into force on January 1, 2020 for ERPs in categories 1 to 3, on January 1, 2021 for ERPs in category 4, and on January 1, 2022 for ERPs in category 5. It should be noted that when several ERPs are located on the same geographical site, the AED equipment can be shared. "Same geographical site" refers to the possibility of accessing the shared AED., at any time, within a timeframe compatible with the cardiac emergency, that is to say in less than 5 minutes.
More information is available on the website of the Ministry of Solidarity and Health:
https://solidarites-sante.gouv.fr/prevention-en-sante/preserver-sa-sante/article/les-defibrillateurs-automatises-externes-dae
You are the owner or manager of a public establishment
- Case processing:
The municipality consults the Fire and Rescue Service (SDIS) and the Departmental Directorate of Territories regarding accessibility for people with reduced mobility. The processing time is four months from the date of submission to the Town Hall. If additional documents are requested, this period only begins upon receipt of the missing documents. - The request for acceptance of works:
Public access buildings (ERP) of categories 1 to 4 and category 5 with sleeping accommodations must request a visit from the safety commission 1 month before the opening of the establishment. - Frequency of safety inspections:
Depending on the type and category of the establishment, periodic visits are organised according to a periodicity (every year to every 5 years).
When to submit a Works Authorization for a public establishment not subject to a Building Permit?
- modification of the internal layout, changes of use of the premises, extension work;
- arrangements likely to modify the conditions of service to the establishment;
- works subject to the filing of a Prior Declaration
Making public establishments accessible
2015 was the legal deadline for making establishments open to the public accessible. The Scheduled Accessibility Agenda (Ad'AP) allows any manager or owner of a public establishment to continue or complete the accessibility improvements after January 1, 2015.
PUBLIC ACCESSIBILITY REGISTER
Since October 22, 2017, a public accessibility register must be made available in establishments open to the public (ERP). It must be accessible to the public on-site at the establishment's main accessible reception area, and possibly in digital format. Its purpose is to inform the public about the accessibility level of the ERP and its services. It serves as a communication tool between the establishment and its users. The register must include a number of documents that vary depending on the ERP's specific circumstances.
BEWARE OF ABUSIVE AND THREATENING SALES SOLICITING
Be vigilant, some companies engage in aggressive and threatening sales tactics, offering to carry out an accessibility audit, provide an accessibility certificate, or create an accessibility register by phone, fax, or email, sometimes impersonating an administrative authority. These solicitations are often fraudulent. Never give out bank details by phone or email. Consult the following document: Aggressive sales tactics: what course of action should be taken?
The following documents are mandatory in the case of a work permit application:
- Cerfa 13824*04 (PDF)
- Accessibility Notice (PDF)
- Safety notice (PDF)
Please provide site plans and location plans, as well as plans of the premises before and after fitting out, at an appropriate scale.
We remind you that if the interior renovation is accompanied by a modification of the exterior appearance of the premises, a prior declaration of works must also be submitted.
The following documents are mandatory when submitting a building permit application:
- Cerfa 13409*06 (PDF)
- PC-specific application form (PDF)
- Accessibility notice (PDF)
- Safety notice (PDF)
Please provide site plans and location plans, as well as plans of the premises before and after fitting out, at an appropriate scale.
Rules regarding the installation of signs
The Commune of Séez does not have a local advertising regulation.
In the absence of local advertising regulations and in accordance with the provisions of Article L.581-18 of the Environmental Code, the installation of a sign is subject to authorization on the buildings and in the places mentioned in Articles L. 581-4 and L. 581-8 of said Code.
1° On buildings classified or registered as historical monuments; ;
2° On natural monuments and in listed sites; ;
3° In the heart of national parks and nature reserves; ;
4° On the trees;
5° In the vicinity of the historical monuments mentioned in the article L. 621-30 of the heritage code; ;
6° Within the perimeter of the remarkable heritage sites mentioned in article L. 631-1 of the same code; ;
7° In regional natural parks; ;
8° In the registered sites; ;
9° Within 100 meters and within the field of vision of the buildings mentioned in section II of the article L. 581-4 ;
10° Within the area of membership of national parks; ;
11° In the special conservation areas and special protection areas mentioned in Article L. 414-1.
Furthermore, regardless of the location, laser beam signs are subject to authorization.
Environmental regulations applicable to signs located in a municipality with fewer than 10,000 inhabitants: insert PDF "sign regulations brochure"«
Public service link (installation rules + form): Commercial signage: installation rules | Public Service for Entrepreneurship
Permission to install a sign and planning permission: two separate procedures
Installing a sign on the front of a shop modifies the exterior appearance of the building. However, this work does not fall within the scope of the prior declaration of works, nor are they regulated by the Town Planning Code.
The authorization of The installation of signs is governed by the Environmental Code, due to the special nature of commercial signs.
However, the Town Planning Code does not completely disregard shop fronts. Thus, when the installation of a sign is accompanied by other works impacting the facade of the premises, These latter are subject to planning permission. This is the case when the project involves renovate the shop front, by carrying out a facade renovation, by enlarging the entrance door of the premises, or by installing an awning.
In this case, Planning permission and authorization to install a sign are complementary. To carry out your work and create your new commercial facade, you must obtain administrative authorization under the Environmental Code, and a prior declaration of works under the Town Planning Code.